150MW/300MWh Battery Energy Storage System Project in Fergana, Uzbekistan | Electrical and Installation Works
my_adm1n2026-05-22T08:12:56+03:00
Project of the new Argande 500/200/20 kV substation (200 km)
my_adm1n2026-05-22T09:32:01+03:00
Project of double-circuit overhead line 500 kV Karakul-Nurabad (260 km)
my_adm1n2026-05-22T09:32:33+03:00
Project of the Sazagan substation and the 500 kV overhead line Khalkha-Sazagan, with a length of 200 km
my_adm1n2026-05-22T09:35:53+03:00
Boston-Ulugnor substation project 110 kV and power line project 110 kV 35.2 km (2×17.6 km)
my_adm1n2026-05-22T09:42:07+03:00