Transform Tech Energy
Transform Tech Energy

Transform Tech Energy

A modern manufacturing facility specializing in the production of metal structures for power transmission lines and electrical grid infrastructure facilities.

A reliable production base for the electric grid industry

О компании

TRANSFORM TECH ENERGY LLC was founded in 2025. The company is a modern industrial enterprise specializing in the production of metal structures of varying complexity, including angle towers for power transmission lines with voltages from 10 to 1000 kV. Production is carried out using high-quality equipment from Italy, Turkey, and China.

The main area of ​​activity includes the design and manufacture of metal transmission line supports of various types (anchor, intermediate, corner, end), the production of crossbars, racks, foundations and other support elements, as well as the manufacture of metal structures for substations and switchgear.

The company supplies and supplies structures for energy facilities and participates in the construction and reconstruction of power grid facilities. The company specializes in power engineering and building metal structures and focuses on servicing power grid infrastructure.

2025 year of foundation

New energy production facility

10–1000 кВ

Production of supports for power transmission lines of a wide voltage class

3 countries of equipment

Italy, Türkiye, China - the technological base of production

5 areas of activity

Design, production, procurement, supply, participation in construction

Transform Tech Energy Services

  • All
  • Реализованные проекты

Tashkent Co-generation Plant

Проект направлен на строительство современных мощностей для совместной выработки электрической и тепловой энергии в Ташкенте. В рамках проекта предусмотрена установка газопоршневых двигателей или газотурбинных установок (ГТУ) общей мощностью до 100 МВт для обеспечения эффективного энергоснабжения города

Toshkent Issiqlik Markazi Thermal Power Plant – Dismantling and restoration work

Тепловая электростанция «Toshkent Issiqlik Markazi» – проект, расположенный в Ташкенте, был направлен на модернизацию мощностей газовой теплоэлектростанции. В ходе реализации были проведены работы по сносу старых структур и восстановлению инфраструктуры для обеспечения бесперебойного энергоснабжения

150MW/300MWh Battery Energy Storage System Project in Fergana, Uzbekistan | Electrical and Installation Works

Проект BESS O’zbekistan расположен в городе Япян (Ферганская область) и был успешно завершен компанией UET Construction в конце 2024 – начале 2025 года. Он обеспечивает стабилизацию энергосети и управление пиковыми нагрузками в Ферганской долине

150 MW/300 MWh Battery Energy Storage System Project in Fergana | General Construction Works .

Проект BESS O’zbekistan в городе Япян Ферганской области Узбекистана является значительным шагом вперед в области энергоэффективности. Обладая мощностью 150 МВт/300 МВт·ч, он оптимизирует использование возобновляемой энергии, интегрирует технологии интеллектуальных сетей и способствует вовлечению местного сообщества. Сотрудничая с заинтересованными сторонами, он создает устойчивый прецедент для региона.

Strategic direction of development

The strategic direction is to become a reliable and competitive manufacturer of metal structures for power transmission lines, ensuring high-quality products, timely deliveries, and long-term cooperation with energy companies in Uzbekistan and abroad.
 

 

Marketing Strategy:

  • Focus on electric power companies, construction and installation organizations
  • Participation in tenders and public procurement
  • Development of partnerships with grid companies and contractors
  • Expanding the geography of supplies: regional → national → export markets

Company Values
Transform Tech Energy

Product quality
Manufacturing products (transmission line supports, metal structures) in accordance with GOST, industry standards, and customer specifications. This ensures durability, safety, and reliability.
Competence and professionalism
Highly qualified employees – engineers, technologists, designers and workers – are considered the foundation for success in the implementation of complex energy projects.
Innovation and development
Implementation of modern metal processing technologies, automation of production, improvement of designs and technological solutions
Customer Focus
Individual approach to customer requirements, flexibility in design solutions and engineering, assistance in the technical selection of optimal transmission line elements
Partnership and reliability
Long-term cooperation with energy companies, suppliers and contractors, based on mutual trust and responsibility

Principles of asset selection and management

Each potential acquisition is assessed against strict strategic and technological criteria.

Compliance with international standards

01

Assets and technologies must meet the highest international quality standards (ISO, EN) and industry requirements
Energy efficiency

02

Preference is given to enterprises and technologies that ensure rational consumption of resources and reduction of energy costs.
Environmental sustainability

03

Minimal environmental impact and compliance with environmental responsibility principles
Potential for growth and scaling

04

Opportunities to increase productivity, modernize and expand the range of services
Stages of implementation
2026

Stage 1

Launch of the first stage of production, reaching design capacity
2027-2028

Stage 2

Expanding the customer base, certifying according to international standards, launching a second production line, and entering export markets
2029-2030

Stage 3

Development of new types of products

We are open to partnerships and long-term solutions.

Submit a request, and our team will contact you to discuss projects, partnerships, or additional information.