Project of the Sazagan substation and the 500 kV overhead line Khalkha-Sazagan, with a length of 200 km

Projects Description

Project of the Sazagan substation and the 500 kV overhead line Khalkha-Sazagan, with a length of 200 km

Scope of Work:

  • Construction Work (Purchase + Installation)
  • Steel Structure Installation
  • Electrical Installation
  • Tower Installation and Assembly
  • String Work Installation

Contractor Type:

  • Subcontractor

Partner Company:

  • ACWA POWER AND LARSEN & TOUBRO

Projects Details