Adolat 100 MW/200 MWh Battery Energy Storage System Project

Projects Description

Adolat 100 MW/200 MWh Battery Energy Storage System Project

Scope of Work:

  • Construction Work
  • Steel Structural Fabrication
  • Fabrication of Embedded Parts and Bolts
  • Piping Work
  • Mechanical Work
  • Electrical Work
  • Drainage System Work
  • HVAC Systems

Contractor Type:

  • Construction Contractor

Partner Company:

  • ENERGY CHINA CEEC

Projects Details