The only company in Uzbekistan engaged in the installation of overhead power lines (OPL) in remote and mountainous areas

Expertise in the construction of energy infrastructure

About the company

JSC “Maksus Elektr Tarmoq Qurilish” is a specialized construction and installation company with extensive experience in the construction of electric power facilities. The company has been operating since 1995, serving as the legal successor to a specialized division established on the basis of the Sredazelektrosetstroy Trust of the USSR Ministry of Energy, which had been constructing power lines and substations in Central Asia and Kazakhstan since 1963.

Over the years, the company has developed the necessary production and technical infrastructure to handle complex infrastructure projects, accumulated significant industry experience, and ensured a high level of personnel training. Operations are conducted through its head office in Tashkent and a system of mobile production sites, enabling it to effectively implement projects in various regions of the Republic of Uzbekistan.

The company operates a modern fleet of construction equipment and specialized vehicles, as well as a team of qualified specialists—high-rise assemblers, machine operators, and drilling and blasting experts. This approach ensures consistent quality and reliability of its work, allowing the company to maintain a leading position in the high-voltage transmission line construction sector in Uzbekistan.

30 years of experience

We have been working in the energy construction market since 1995

110-500 кВ

Construction and reconstruction of high-voltage power lines and substations

5 production sites

Mobilized areas in different regions of Uzbekistan

158.5 billion soums

Volume of completed construction and installation works since 2010

METQ Services

  • All
  • Реализованные проекты

150MW/300MWh Battery Energy Storage System Project in Fergana, Uzbekistan | Electrical and Installation Works

Проект BESS O’zbekistan расположен в городе Япян (Ферганская область) и был успешно завершен компанией UET Construction в конце 2024 – начале 2025 года. Он обеспечивает стабилизацию энергосети и управление пиковыми нагрузками в Ферганской долине

Project of the new Argande 500/200/20 kV substation (200 km)

В Кабуле (Афганистан) UET Construction (EPC-подрядчик) строит подстанцию «Арганде» 500/200/20 кВ (200 км). Совместно с Минэнерго РУз выполняется полный цикл: от проектирования до электромонтажа.

Project of double-circuit overhead line 500 kV Karakul-Nurabad (260 km)

В Узбекистане UET Construction (EPC-подрядчик) для Национальной электрической сети строит двухцепную ВЛ 500 кВ «Каракуль-Нурабад» (260 км). В объем входят проектирование, поставка и все этапы строительства.

Project of the Sazagan substation and the 500 kV overhead line Khalkha-Sazagan, with a length of 200 km

В Узбекистане UET Construction как субподрядчик ACWA POWER и L&T возводит подстанцию «Сазаган» и ВЛ 500 кВ (200 км). Объем работ включает строительство, электромонтаж, а также установку вышек и проводов.